Most of the year, a condo's emergency generator sits quietly in its room, starting up only for a scheduled test. Then a winter storm or an ice-laden tree takes down a feeder line, the building goes dark, and everyone finds out at once whether the generator starts, how long the fuel lasts and what it actually keeps running. For residents on upper floors, the answer matters a great deal.
This guide is for Ontario condo boards and directors who want to know what the rules expect of an emergency generator, what a sound testing and maintenance program looks like, and what questions to ask the property manager and service contractor before the next outage. It focuses on the equipment itself. For the wider plan, including the first hour of an emergency and communication with residents, see our guide to condominium emergency preparedness in Toronto.
Why the generator deserves a place on the board agenda
An emergency generator is part of the building's life-safety equipment, not just a convenience. In many mid-rise and high-rise buildings, the emergency power system is designed to carry loads such as emergency lighting, the fire alarm system and fire-fighting equipment, and in some buildings one or more elevators. The exact list depends on how the building was designed and the code in force when it was built.
That makes the generator a governance issue as well as a maintenance one. The board approves the budget that pays for testing, signs the service contract, decides when to repair or replace major components, and answers to owners if something fails. A board that has never seen a generator test record or a fuel log is taking more risk than it may realize.
Who is responsible under the Condominium Act
In most corporations, the generator, its fuel tank and its transfer equipment are common elements. Section 90(1) of the Condominium Act, 1998 says that, subject to section 91, the corporation shall maintain the common elements, and section 90(2) says the obligation to maintain includes repairing after normal wear and tear. Section 89 deals with repair after damage, and section 89(2) says that obligation includes repairing and replacing after damage or failure. Section 91 allows the declaration to change these default obligations, so the board should confirm what its own declaration says.
In practice, the board delegates the day-to-day work to the property manager and a qualified generator service contractor, but the corporation keeps the obligation. Delegating the work does not delegate the responsibility. If you want a clearer picture of who decides and who does the work, our article on condo board and property manager responsibilities sets that out.
What the Ontario Fire Code requires
The Ontario Fire Code (O. Reg. 213/07) contains specific requirements for emergency power systems in Section 6.7 of Division B. Boards don't need to memorize them, but they should know the main points, because these are what a fire inspector may ask to see.
- Inspection, testing and maintenance to a CSA standard. Article 6.7.1.1 requires emergency power systems to be inspected, tested and maintained in conformance with CSA C282, "Emergency Electrical Power Supply for Buildings". The Fire Code's table of referenced documents currently names the 2015 edition. The detailed test frequencies and procedures are set out in that standard, so ask your contractor to show you how their schedule follows it.
- Notice when the system is shut down. If the emergency power system or any part of it is shut down, Article 6.7.1.1(3) requires the fire department and building occupants to be notified in accordance with the Code's notification procedure, and supervisory staff to be notified as well. Planned shutdowns for repairs therefore need a notice plan, not just a work order.
- Starting and switching instructions. Article 6.7.1.2 requires instructions for switching on essential loads and for starting the generator when this is not done automatically. Those instructions should be posted where staff can find them and kept current after any equipment change.
- Written records. Article 6.7.1.3 requires written records to be maintained as required in CSA C282. The Code's general record rules in Subsection 1.1.2 require records to be kept at the building for at least two years, and so that at least the most recent and the immediately preceding record of a given test or inspection are kept. Electronic records that can be made readily available to the Chief Fire Official on request are deemed to comply.
- Fuel on hand. Article 6.7.1.4 requires the fuel stored and connected to the emergency power system to be enough to run the engine for at least 2 hours.
- Fresh fuel. Article 6.7.1.5 requires liquid fuel storage tanks to be drained and refilled with fresh fuel at intervals not greater than 12 months. The Code allows this to be achieved by replenishment through the normal test program.
The two-hour fuel requirement is a minimum, not a target. A multi-day winter outage will burn through much more than that, so boards should know how many hours their tank actually supports at typical load and how quickly fuel can be delivered in an emergency.
Emergency lighting has its own requirements in the same Section, including monthly inspections and tests of self-contained emergency lighting units under Article 6.7.1.6. Your generator contractor may not handle these, so confirm who does. Our guide to fire safety obligations for Toronto condo boards covers the fire safety plan and the other fire protection systems.
What a good testing and maintenance program looks like
A sound program has a few parts that work together. The specific intervals come from CSA C282 and the manufacturer, but the structure is similar in most buildings.
Routine inspections and test runs
Regular inspections check the engine, battery, coolant, oil, fuel level, block heater and alarms, and confirm the generator is set to start automatically. Periodic test runs confirm the engine starts and reaches operating condition. Each run should be logged with the date, time, who did it, readings taken and anything found.
Load testing and transfer
A generator that only ever runs without a load can look healthy until the day it is needed. Ask your contractor how the program tests the generator under load and how often the automatic transfer switch is exercised to confirm the building actually moves onto generator power. These tests can affect residents, for example by briefly interrupting elevators or lighting, so they need to be scheduled and announced.
Fuel quality and tank care
Stored diesel can degrade, absorb water and grow microbial contamination. Beyond the Fire Code's 12-month fresh-fuel rule, ask whether the contractor samples the fuel, checks for water in the tank and inspects the tank, piping and any day tank for leaks. If your generator runs on natural gas, the fuel-storage rules work differently, so ask the contractor to explain what applies to your system.
Annual service and deficiencies
A yearly service typically covers filters, fluids, belts, hoses, batteries and a fuller inspection. The output that matters to the board is the deficiency list: what was found, what it will cost to fix, and how urgent each item is. Article 1.1.1.2 of the Fire Code's Division B requires any device or component that does not operate as intended during a required check, inspection or test to be repaired or replaced if its failure would adversely affect fire or life safety. Deficiencies should not wait for the next budget year.
What to check in the generator service contract
Generator work is specialized, and the contract is where the board sets expectations. Before signing or renewing, check that it covers:
- A schedule of inspections and tests that the contractor confirms follows CSA C282 and the manufacturer's requirements.
- Who performs load tests and transfer switch tests, and how residents and the fire department are notified when a test or repair takes the system out of service.
- Response times for emergency calls, including nights, weekends and holidays.
- Fuel arrangements: who orders fuel, minimum levels before a refill is triggered, and priority delivery during a widespread outage.
- Written reports after every visit, in a form that satisfies the Fire Code record requirements.
- How deficiencies are reported and priced, and the dollar limit above which board approval is needed.
- Proof of insurance, and the qualifications of the technicians doing the work.
Our guide to boilers, chillers and mechanical rooms covers similar contract points for the rest of the central plant, and it is worth reviewing both contracts at the same time.
Know what the generator does and doesn't power
One of the most common sources of frustration in an outage is the gap between what residents assume the generator powers and what it actually powers. In many condos, suites stay dark, in-suite heating and cooling stop, and only some elevators run. Domestic water pumps, garage doors, entry systems, security cameras, and the management office may or may not be on emergency power.
Ask your manager for a plain-language list of what is on generator power, based on the electrical drawings and confirmed during a test. Keep it with the fire safety plan materials, give a copy to front-desk and security staff, and use it to write resident notices. If something important to residents is not on emergency power, the board can decide whether to accept that, plan around it, or get an engineer's advice on changes.
Plan for a long outage, not just a short one
Most outages are short, but boards should think through a longer one before it happens. Useful questions include:
- How many hours will our fuel last at typical load, and who calls for a refill?
- Who on staff or on call knows how to check the generator and the transfer switch?
- How will we tell residents what is working, and how often will we update them?
- Which residents may need extra help if elevators are limited, and how will staff respond?
- What happens to the building if the generator itself fails during the outage?
Your manager's after-hours coverage is a big part of this. Our article on after-hours and emergency response explains what boards should require from their manager when something goes wrong at 2 a.m.
Records the board should be able to see
A board doesn't need to read every test sheet, but it should be able to ask for and receive:
- The test and inspection log for at least the past two years, as the Fire Code requires to be kept at the building.
- The most recent annual service report and deficiency list, with the status of each item.
- Fuel delivery records and the date of the last fuel replacement or replenishment.
- The posted starting and switching instructions.
- A record of any time the system was shut down and how the fire department and residents were notified.
A short generator line in the manager's monthly report, covering the last test, any deficiencies and fuel level, is usually enough to keep the board informed between annual reviews.
Planning for replacement
Generators, transfer switches and fuel tanks wear out. Section 93(2) of the Condominium Act says a reserve fund shall be used solely for the purpose of major repair and replacement of the common elements and assets of the corporation, so these components should appear in your reserve fund study with realistic remaining life and cost estimates. When the contractor's reports start to show recurring deficiencies or parts become hard to find, ask your reserve fund planner and an electrical engineer whether the timing in the study still makes sense. Replacing a generator is usually a planned project, not a quick swap, so early planning helps.
A quick checklist for your next board meeting
- Confirm who services the generator and when the contract renews.
- Ask for the last 12 months of test records and the latest deficiency list.
- Confirm the fuel level, run time at typical load and the last fuel replacement date.
- Ask for a written list of what the generator powers.
- Check that starting and switching instructions are posted and current.
- Confirm the generator, transfer switch and tank are in the reserve fund study.
- Agree on how residents will be told about planned tests and real outages.
How Brilliant Property Management can help
Our managers keep generator testing, fuel and records on a schedule, report deficiencies to the board with clear recommendations, and coordinate notices when the system is out of service. Learn more about our condo property management in Toronto and the full range of our property management services. If your board is reviewing its management arrangements, you can request a proposal.
Frequently asked questions
Which standard governs condo generator testing in Ontario?
Article 6.7.1.1 of Division B of the Ontario Fire Code requires emergency power systems to be inspected, tested and maintained in conformance with CSA C282, "Emergency Electrical Power Supply for Buildings". The test frequencies and procedures are set out in that standard.
How much fuel does a condo generator need to have?
Article 6.7.1.4 of the Fire Code requires enough fuel stored and connected to run the engine for at least 2 hours. That is a minimum, so boards should also plan for longer outages.
How often does generator fuel have to be replaced?
Under Article 6.7.1.5, liquid fuel storage tanks must be drained and refilled with fresh fuel at intervals not greater than 12 months, although this can be achieved by replenishment through the normal test program.
How long must generator test records be kept?
The Fire Code requires records to be kept at the building for at least two years, and so that at least the most recent and the immediately preceding record of each test or inspection are kept. Electronic records that can be made readily available to the Chief Fire Official are acceptable.
Who pays for generator maintenance and replacement?
The generator is usually a common element, so routine maintenance is an operating cost and major repair or replacement is normally funded from the reserve fund. Check your declaration, since section 91 of the Condominium Act allows it to change the default repair and maintenance obligations.
This article is general information about Ontario condominium operations, not legal advice. For advice on your corporation's situation, speak with a qualified condominium lawyer or engineer and review your declaration, by-laws and the Ontario Fire Code.